Huntington Homes provided a “naked modules” package for this project. Our scope included all of the framing, mechanical rough-in, insulation, air sealing, sheetrock, sheathing, and windows. The local contractor provided all interior and exterior finishes.
Architect
Albert, Righter & Tittmann Architects, Inc
General Contractor
H + Y Construction
Date Built
2012
The building envelope features a 12” double stud wall, Marvin triple pane windows, and a high efficiency HVAC system. This home won a 2016 Builders Choice, and Custom Home Design Award for Modular / Prefab from Builder Online.