It Depends.
Contact Us . We’d appreciate the opportunity to discuss your project with you.
It generally takes 4 – 8 weeks to put together the details. Then we generally run 8 – 14 week deliveries from contract. Then it should take your contractor another 6 – 12 weeks to do the onsite button-up work. SO, Five to Nine months start to finish.
We start with a meeting. At this first meeting we’ll; discuss your goals, look at potential floorplans, and discuss budget pricing. This is the meeting where we’re feeling each other out. You know, making sure we have the chemistry . . . .
If you already have a floorplan and/or a good idea of the finishes you want (siding, roofing, mechanicals, etc) then we’ll propose we run some budget pricing. It’s good to get onto the same page, early.
If things look good we’ll ask a $3000 Design Deposit to start our Pre-Construction Work. Pre-Construction is where we’ll build the home on paper. This includes polishing the design, making final decisions on finishes, and pricing our package We’ll also put together our Contract at this time. The Contract includes a description of what we’re providing, and what the Contractor provides.
You’ll share our paperwork with your Contractor. They’ll need to provide you with pricing and a contract for their “button-up” work.
You’ll then take BOTH contracts to the bank. And get a Construction Loan.
Once you have financing we’ll sign contracts, take a deposit, and assign a build date.
We build.
Your contractor finishes.
You live happily ever after
We have built over 500 homes on the islands of Nantucket and Martha’s Vineyard. It makes a lot of sense to barge value add modules to the islands rather than sticks of building materials.
The Process / Timing / Drawing Deposits are a bit different for projects on the Islands. Nantucket requires an extensive Architectural review (HDC) before we can start the process. And both islands require larger lead times to schedule barges, cranes, and set crews.
Drawing Deposits for Island construction are $3000 per project. For Nantucket this includes a drawing set to be used at HDC.
Lead Time for the Islands is generally 6 – 9 months.